Q: What are the conditions under which a Zoning Permit is required?A: * Construction ostructural alteration of any building, including accessory buildings.
* Change in use of an existing
building, accessory building or land to a use not listed as a permitted use in the zoning district where the building or land is located.
* Occupancy and use of vacant land.
* Any alteration, expansion or other change of a lawful nonconforming use as regulated by Article VII.
(Section 3.02, Article III, of Circleville Zoning Code)
For more information, contact Debby Hammond at 740-477-8224.

Top